GE - General Electric GE 115 Volt Room Air Conditioner AEN08LPQ1

User Manual - Page 10

For AEN08LPQ1.

PDF File Manual, 52 pages, Download pdf file

Loading ...
Loading ...
Loading ...
Installation Instructions
10
INSTALL THE TOP MOUNTING RAIL
ONTO THE CASE
Attach the top mounting rail onto the top of the
case with 3 Type B screws.
5
Type B
screws
Top
mounting
rail
INSTALL THE
SIDE ACCORDION PANELS
Slide the left and right accordion panels into
the top and bottom mounting rails.
Attach the accordion panels to the case using
3 Type A screws on each side.
6
A
B
Type A
screws
Top mounting rail
Bottom mounting rail
Accordion
panel
BACK
PREPARE THE WINDOW
Cut the window sash seal to the window
width and stick the adhesive side to the
bottom of the sash.
7
Window sash seal
INSIDE
4
ATTACH THE TOP MOUNTING RAIL
SEAL STRIP
Remove the backing from the top mounting rail
seal strip and attach the seal strip to the bottom
of the top mounting rail, along the front edge.
REMOVE THE AIR CONDITIONER
FROM THE CASE (CONT.)
Slide the air conditioner from the case by
gripping the base pan handle and pulling
forward while bracing the case. Do not pull or
lift on the styrofoam discharge area
FRONT
Do not
pull or
lift in this
area—
damage
to the
unit may
result
E
3
Top mounting rail
Remove
backing
from seal
strip
Top mounting rail
Seal strip
FRONT VIEW
Loading ...
Loading ...
Loading ...