Loading ...
Loading ...
Loading ...
6
INSTALLATION INSTRUCTIONS
NOTES:
Depending on your model, determine which venting method
to use: roof, wall or non-vented (recirculating).
It is recommended that the vent system be installed before the
range hood is installed. Go to “Venting System” in the
“Installation Requirements” section if you need assistance.
Before making cutouts, make sure there is proper clearance
within the ceiling or wall for the vent system.
1. Disconnect power
2. Mark Hole Locations
Align the exterior edge of the mounting brackets with the exterior
edges of the upper cabinet.
IMPORTANT: The brackets should touch the upper cabinet.
With a pencil, mark the upper holes on the brackets.
3. Install Brackets
Using a #2 Phillips screwdriver, install the drywall anchors.
Using #8-18 x 1" (4.2 x 25 mm) flat-head #2 Phillips screws,
install the mounting brackets using the upper holes.
NOTE: For installations to a surface other than drywall, it is
recommended that a qualified contractor determine the
anchoring method.
4. Prepare Range Hood
Set the range hood on its back on a covered surface.
Remove the filter, locking screw, and side panels.
Remove the rectangular damper.
Using a #2 Phillips screwdriver, remove the electrical box
cover.
Using a flat-blade screwdriver, remove the appropriate power
supply knockout.
5. Mark Hole Locations
Lift the range hood into place and insert the mounting bracket
tabs through the slots in the back of the range hood.
Loading ...
Loading ...
Loading ...