Loading ...
Loading ...
Loading ...
INSTALLATION INSTRUCTIONS
3
1
2
3
4
5
6
7
MOUNTING ONTO GROUND
Before installing the parcel mailbox, a concrete pad
must be created where it will be installed.
1. Dig a hole 50 cm (19.7 inches) square and 15
cm (5.9 inches) deep.
2. Fill the hole with concrete. Use a spirit level
to level the concrete and then let it set before
continuing the installation.
3. Place the parcel mailbox in the chosen location
and mark the mounting holes.
4. Drill four holes 8 mm (0.3 inches) in diameter
and 60 mm (2.4 inches) deep into the concrete
oor for the mounting bolts.
5. The mounting bolt has 5 component parts. The
bolt, the bolt sleeve, the large washer, the small
washer and the hexagonal nut. The mounting
bolt should be assembled as shown before being
installed.
6. Tap the mounting bolt into place.
7. Tighten the hexagonal nut. This causes the bolt
sleeve to expand and secure the mounting bolt
in place.
Loading ...
Loading ...
Loading ...