Smeg Gas Cooker TR90BL9 Victoria Aesthetic

User Manual - Page 47

For TR90BL9.

PDF File Manual, 50 pages, Download pdf file

Loading ...
Loading ...
Loading ...
Installation
99
EN
Positioning and levelling
The appliance must sit level on the floor to
ensure stability.
• After making the gas and electrical
connections, level and stabilise the
appliance on the floor by screwing the
foot in or out.
Assembling the upstand
The upstand must always be positioned and
secured correctly on the appliance.
1. Loosen the 6 screws on the back of the
hob (A) and unscrew the 2 screws (B) on
the side part of the upstand.
2. Place the upstand on the hob. Align the 6
bottom slots of the upstand with the 6
screws on the back of the hob that were
previously loosened.
3. Screw down the 6 screws on the back of
the hob (A) and the 2 screws under the
hob (B) to secure the upstand.
Heavy appliance
Risk of damage to the appliance
• Insert the front feet first and then the rear
ones.
The upstand provided is an
integral part of the product. It must
be fastened to the appliance prior
to installation.
Loading ...
Loading ...
Loading ...