Loading ...
Loading ...
Loading ...
8
PREPARE THE HOOD
1. Remove the knockout for the chosen opening (horizontal at the back of the hood or vertical on top).
See illustrations below.
PREPARE THE INSTALLATION
HORIZONTAL DISCHARGE
VERTICAL DISCHARGE
Cut-out the openings for duct (A) and power cable (B), in cabinet or wall, according to the direction of discharge chosen.
See gures below.
NOTE: The cut-out opening for house wiring can be made in cabinet bottom OR wall, no matter the discharge chosen
(vertical or horizontal).
HOOD WIDTHS DIMENSION C
30" 13"
36" 16"
HOOD WIDTHS DIMENSION C
30" 13"
36" 16"
HD0588A
L
C
B
CABINET BOTTOM VIEW
5¼”5¼”
3¾”
A
L
C
2”
B
3¾”
5¼” 5¼”
A
9⅛
C
C
2”
2”
2”
7/8”
VERTICAL DISCHARGE
HORIZONTAL DISCHARGE
1
2 3
HR0021
1
2
3
BACKSPLASH INSTALLATION (OPTIONAL)
Backsplash must be installed before the hood shell because it covers the backsplash top mounting screws. In order
to be able to install the backsplash, make sure you have at least 18" clearance between bottom of hood and range
control panel or cooktop. (See instructions packed with backsplash.)
Loading ...
Loading ...
Loading ...