Loading ...
Loading ...
Loading ...
ENGLISH
17
ASSEMBLING AND PREPARING
CAUTION
y
Disconnect the power first, and then move or
install the TV. Otherwise electric shock may
occur.
y
If you install the TV on a ceiling or slanted wall,
it may fall and result in severe injury.
y
Use an authorized LG wall mount and contact
the local dealer or qualified personnel.
y
Do not over tighten the screws as this may
cause damage to the TV and void your
warranty.
y
Use the screws and wall mounts that meet the
VESA standard. Any damages or injuries by
misuse or using an improper accessory are not
covered by the warranty.
y
Screw length from outer surface of back cover
should be under 8mm.
Wall mount Pad
Back Cover
Standard screw
: M4 x L10
Wall mount Pad
Back Cover
Max.8mm
y
Wall Mount (A x B)
A
B
NOTE
y
Use the screws that are listed on the VESA
standard screw specifications.
y
The wall mount kit includes an installation
manual and necessary parts.
y
The wall mount bracket is optional. You can
obtain additional accessories from your local
dealer.
y
The length of screws may differ depending
on the wall mount. Be sure to use the proper
length.
y
For more information, refer to the instructions
supplied with the wall mount.
Tidying cable
(Only 19MN43*, 24/27MT46*)
1 Gather and bind the cables with the supplied
cable holder.
2 Place the cable on the hook located on the stand
base.
Cable Holder
Loading ...
Loading ...
Loading ...