Loading ...
Loading ...
Loading ...
4
FILL THE HOT WATER TANK
1. Slide empty brew funnel into funnel guides
as shown.
2. Fill carafe with cold water.
Spin or flip brewer lid open and pour water
into brewer. Position carafe on base below
brew funnel. Close lid and wait 3 minutes
while internal tank partially fills.
3. Repeat step 2.
Open the brewer lid. Remove the carafe and
fill with cold water again. Pour water into
brewer. Position carafe on base below brew
funnel. Close lid.
4. Wait until water flows from the brew
funnel.
If any water flows, the tank is full. When water
flow stops, pour out water that has collected in
the carafe. Replace carafe on base below brew
funnel. NOTE: It takes two full carafes to fill
the internal hot water tank completely.
5. Plug in the brewer.
6. Turn on the brewer.
Press the vacation switch located on the side
(NHS, GR, BT, BX) or back (ST) of the brewer
(press I to turn ON; press O to turn OFF). If
you see red on the end of the switch, machine
is ON. Wait 15 minutes for water in the tank
to heat. NOTE: Your brewer is designed to
remain on at all times following initial setup,
except when cleaning or if brewer will not be
used for 3 or more days.
You have now filled the hot water tank and are ready to brew
your first pot of coffee! See the brewing instructions that follow.
B
U
N
N
6
4
8
1
0
B
U
N
N
6
4
8
1
0
B
U
N
N
6
4
8
1
0
B
U
N
N
6
4
8
1
0
NHS/ST
NHS
ST
BT/BX/GR
Loading ...
Loading ...
Loading ...