Kenmore 69133 8.8 cu. ft. Electric Dryer w/ Steam Refresh

Installation Instructions - Page 16

For 69133.

PDF File Manual, 72 pages, Read Online | Download pdf file

69133 photo
Loading ...
Loading ...
Loading ...
16
Venting Requirements
WARNING: To reduce the risk of re, this dryer MUST BE
EXHAUSTED OUTDOORS.
IMPORTANT: Observe all governing codes and ordinances.
Dryer exhaust must not be connected into any gas vent, chimney,
wall, ceiling, attic, crawlspace, or a concealed space of a
building. Only rigid or exible metal vent shall be used for
exhausting.
4"
(102 mm)
4" (102 mm) heavy metal exhaust vent
Only a 4" (102 mm) heavy metal exhaust vent and clamps
may be used.
Do not use plastic or metal foil vent.
Rigid metal vent:
Recommended for best drying performance and to avoid
crushing and kinking.
Flexible metal vent: (Acceptable only if accessible to clean)
Must be fully extended and supported in nal dryer location.
Remove excess to avoid sagging and kinking that may
result in reduced airow and poor performance.
Do not install in enclosed walls, ceilings, or oors.
The total length should not exceed 7
3
/
4
ft. (2.4 m).
The length of exible metal vent used must be included in the
overall vent system design as shown in the “Vent System Chart.”
NOTE: If using an existing vent system, clean lint from entire length
of the system and make sure exhaust hood is not plugged with
lint. Replace plastic or metal foil vents with rigid metal or exible
metal vents. Review Vent System Chart and if necessary, modify
existing vent system to achieve best drying performance.
VENTING
Connect gas supply to dryer
1.
Remove red cap from gas pipe. Using a wrench to tighten,
connect gas supply to dryer. Use pipe-joint compound
on threads of all non-ared male ttings. If exible metal
tubing is used, be sure there are no kinks.
NOTE: For propane gas connections, you must use pipe-joint
compound resistant to action of propane gas. Do not use
TEFLON
®
tape.
A
B
Non-ared
male tting
Flared
male tting
Open shut-o valve
3.
Open shut-o valve in supply line; valve is open when handle
is parallel to gas pipe. Then, test all connections by brushing
on an approved noncorrosive leak-detection solution. Bubbles
will show a leak. Correct any leaks found.
A
B
Open valve
Closed valve
B
A
D
C
Plan pipe tting connection
2.
A combination of pipe ttings must be used to connect dryer
to existing gas line. A recommended connection is shown. Your
connection may be dierent, according to supply line type,
size, and location.
A. 3/8" exible gas connector
B. 3/8" dryer pipe
C. 3/8" to 3/8" pipe elbow
D. 3/8" pipe-to-are adapter tting
MAKE GAS CONNECTION -
U.S.A. AND CANADA
Loading ...
Loading ...
Loading ...