Loading ...
Loading ...
Installation Instructions
Pre-lnstallation Checklist
ALL INSTALLATION INFORMATION
ON THE FOLLOWING PAGES IS TO
BE USED FOR SINGLE AND DOUBLE
OVEN INSTALLATION!
Remove packaging materials.
Check behind hinges and under
false bottom. Remove labels on the
outside of the door, plastic on trims
and panel, all tape around the oven,
and any shipping screws securing
the oven to the base pad.
Oven Racks
Broiler Pan
and Grid Literature
Pack
Open oven door and remove literature
pack, broiler pan and grid, and oven
racks.
Remove Installation Instructions from
literature pack and read them carefully
before you begin.
Be sure to place all literature, Use and
Care, Installations, etc. in a safe place
for future reference.
m
Door removal is not a requirement for
installation of the product, but is an
added convenience. To remove the door:
Open the oven door as far as it will go.
Push both hinge Hinge
_ _'qb,,. Unlocked
locks down toward . ._i_l /
',_'I Position
the door frame, Hmgei/_,i
to the unlocked s_ot _
position. This may
require a flat blade Hinge
screwdriver. Arm
DO NOT LIFT THE DOOR
BY THE HANDLE!
Place hands on both sides of
the door, and close the oven
door to the removal position.
This is half way between the
broil stop and fully closed.
[_ Lift door up and
out until the
hinge arms
clear the slots.
Hint e Clears Slot
NOTE: The oven door is very heavy, Be sure
you have a firm grip before lifting the oven
door off the hinges, Use caution once the
door is removed. Do not lay the door on its
handle, This could cause dents or scratches,
(Continued on following page)
3
Loading ...
Loading ...
Loading ...